|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
胡麻岭隧道大变形力学行为及控制技术研究(51 卷) |
英文标题 |
Study on large-deformation mechanical behaviour and its controlling technology in Humaling tunnel |
摘要 |
以在建“兰渝客运专线”胡麻岭高地应力软岩大断面隧道为依托,采用FLAC3D三维数值模拟程序,深入研究喷锚联合支护和掌子面预加固工法施工力学行为。总结了高地应力隧道不同施工工法开挖过程中围岩变形特性、塑性区分布特征、力学响应和能量积聚、迁移规律。 |
作者 |
新闻作者:付迎春 |
关键字 |