|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
哈大客运专线CFG桩及桩间土防冻胀措施研究(51 卷) |
英文标题 |
Study on anti-frost-heave of CFG (Cement Flyash Gravel ) pile and soil between piles on Harbin-Dalian passenger-dedicated railway |
摘要 |
哈尔滨至大连铁路客运专线采用CFG桩进行地基处理,由于哈大客专地处严寒地区,为保证进入冬季之前刚灌注的CFG桩成桩质量,采取冬季施工措施,使CFG桩及桩间土顺利过冬期,本文对覆盖土法、覆盖保温材料法进行了对比,推荐使用覆盖玉米杆保温法,介绍了该方法的施工工艺及关键 |
作者 |
新闻作者:张先军,李新乐 |
关键字 |