|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
连续皮带机出渣工况下TBM掘进与二次衬砌同步施工技术(51 卷) |
英文标题 |
Synchronizing of TBM (Tunnel Boring Machine ) driving with second lining casting under condition of mucking-out using belt continuous conveyer |
摘要 |
以往TBM掘进施工过程中不论采用有轨运输方式出渣还是连续皮带机出渣,都是TBM掘进完成后施作二次模筑衬砌,工期较长,并且与新奥法施工原理不相符,不利于施工安全,不满足施工周期不断缩短的要求。为此,结合西秦岭隧道施工实践,研究了连续皮带机出渣工况下,开敞式TBM掘进 |
作者 |
新闻作者:齐梦学 |
关键字 |