|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
填海区富水砂层下覆基岩混合断面盾构施工技术(51 卷) |
英文标题 |
Construction technology of shield-driving tunnel in mixing stratum consisting of water-rich –sand and bedrock in seaside |
摘要 |
结合深圳地铁2号线工程实例,详细介绍了填海区地铁盾构通过高强度基岩地质区域的施工技术,对盾构掘进过程中遇到基岩地层加固、开仓换刀、盾构掘进等处理措施进行了全面阐述。采用洞内、地面注浆加固,完成常压进仓进行刀具检查更换。盾构过基岩隆起区合理控制掘进参数并采取 |
作者 |
新闻作者:王朝义 |
关键字 |