|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
乌精二线无缝线路应力放散施工技术(51 卷) |
英文标题 |
Construction technology of destressing in CWR(Continuous Welded Rail) used in Urumqi-Jinghe second railway line |
摘要 |
在无缝线路施工中,应力放散均匀和锁定轨温的控制是施工过程中的核心问题,应力放散均匀,使实际锁定轨温控制在设计锁定轨温范围内,是施工控制的关键工序。本文主要以乌精二线无缝线路应力放散及锁定施工为例,介绍无缝线路施工过程中应力放散的施工技术。 |
作者 |
新闻作者:闫瑞 |
关键字 |