|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
特长隧洞施工高强度运输尾气排放通风仿真分析(51 卷) |
英文标题 |
Ventilation simulation analysis on eliminating of emissions of gases from high-density transport vehicles during super-long tunnel construction |
摘要 |
以锦屏二级水电站特长引水隧洞工程施工为背景,对高强度运输尾气污染的洞身段施工通风技术进行研究。运用隧道工程与通风理论以及仿真技术,分析了高尾气污染特长隧洞洞身段施工通风方案及参数,建立了4#引水隧洞洞身段物理模型并提出了仿真分析边界条件。仿真分析结果表明, |
作者 |
新闻作者:罗汝洲 |
关键字 |