|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
“5.12”汶川地震中高大加筋土挡墙破坏机理研究(50 卷) |
英文标题 |
Study on failure mechanism of high-large reinforced earth retaining wall during “5.12” Wenchuan earthquake |
摘要 |
为了进一步研究高烈度区加筋土挡墙的破坏机理,以5.12汶川地震中发生破坏的一处高大加筋土挡墙为实例,建立数值模型,利用现场实测数据,通过有限元软件的计算,得出了加筋土挡墙在不同烈度地震作用下墙体面板的水平位移、墙后土体的水平加速度及墙背土压力沿墙高的分布情况 |
作者 |
新闻作者:陈 强,杨长卫,张建经,周新文 |
关键字 |