组合注浆施工技术在电力隧道穿越老旧民房施工中的应用(50 卷) |
英文标题 |
Application of composite grouting technology in construction of electric power tunnel passing through nearby aged residential houses |
摘要 |
北京市新建南苑变电站—玉泉营变电站电力隧道工程,在石榴庄路至玉泉营变电站区间隧道向下穿越当地居民的老旧民房。为达到隧道穿越施工不拆迁居民房屋的要求,采用了TGRM前进式深孔注浆工艺和袖阀管注浆工艺组合施工技术,在隧道内进行超前水平注浆加固的方案。该组合注浆技 |
作者 |
新闻作者:彭 峰,孔 恒,于 良 |