标题 |
武广铁路客运专线综合接地预留方案与工程实践(50 卷) |
英文标题 |
Integral neutral grounding preplanning and engineering practice of Wuhan-Guanzhou passenger-dedicated railway |
摘要 |
介绍武广铁路客运专线建设中通信、信号、电力、接触网等站后四电专业在路基、桥梁、隧道工程中的综合接地接口预留方案,探讨客运专线综合接地技术的具体实践,结合武广客运专线目前综合接地工程实际,提出了接地方案的施工质量控制要点。 |
作者 |
新闻作者:曹宇澄,苏志良,孟乐平,吕继涛 |
关键字 |