|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
环行试验线大环线和内环线连接装置改进研究(49 卷) |
英文标题 |
Study on improving of connecting equipments between external big loop and internal loop in Loop Railway Test Base |
摘要 |
为进行广深线准高速试验,环行铁道试验线大环和内环线连接和交叉处增设了连接装置,解决了多年来靠拨道、改道、捣固实现线路转换的方式和试验提速问题。但是受当时技术水平和条件的限制,既有连接装置存在许多问题,必须予以改进,使线路更加安全,试验数据更加可靠。 |
作者 |
新闻作者:董相中, 晋杰, 闫晓春 |
关键字 |