|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
高速铁路CFG桩施工工艺及质量控制研究(49 卷) |
英文标题 |
Study on construction technology and quality control of CFG piles used in composite foundation of high speed railway |
摘要 |
为给京沪高速铁路CFG桩设计与施工提供依据,也为了积累CFG桩相关原始数据、修编相应规范、推动地基处理技术的发展,在京沪高速铁路试验段进行了一系列CFG桩施工工艺跟踪试验研究,建立了高速铁路CFG桩复合地基施工工艺和质量控制体系,得出主要结论是:混合料搅拌时间控制在6 |
作者 |
新闻作者:王连俊,姜龙,丁桂伶,刘升传 |
关键字 |