标题 |
高地应力下大断面隧洞混凝土施工技术研究(49 卷) |
英文标题 |
Study on construction techniques of concrete lining in tunnel with large cross section under high primary stress |
摘要 |
以锦屏二级水电站隧洞工程建设为背景,对高地应力下大断面隧洞混凝土施工技术进行研究。通过对隧洞的围岩地质、断面形状及几何尺寸、施工等条件进行分析,结合隧道工程理论及混凝土施工方法,提出了高地应力下特大断面隧洞底拱和顶拱的混凝土衬砌施工技术、施工步骤和施工方 |
作者 |
新闻作者:陈铁骑 |
关键字 |