|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
长大隧道钻爆法施工中通风防尘方案(49 卷) |
英文标题 |
Scheme of ventilation and dust-proof in construction of long tunnel with large cross-section using drilling-blasting method |
摘要 |
介绍了在辽宁省大伙房水库输水工程D&B2标段6#支洞施工段钻爆法施工中通风防尘的设计和施工。其主要内容包括隧洞施工中通风防尘的标准,通风设备的选择,通风系统的布置,辅助通风措施,综合防尘措施以及提高通风效率的措施等。 |
作者 |
新闻作者:张成刚 |
关键字 |