襄樊汉江五桥双壁钢围堰分层分块施工技术(51卷) |
英文标题 |
Construction technology of double-walled steel cofferdam completed by block-by-block and layer-by-layer method used for Xiangfan Hanjiang river fifth bridge |
摘要 |
结合襄樊市内环线汉江五桥12#主墩承台的工程实例,介绍了分层、分块式钢围堰的构造、加工及拼装,详细论述了双壁钢围堰的施工工艺,可为同类工程提供参照。 |
作者 |
新闻作者:赵兴寨,张斌斌,刘蓓 |
关键字 |
关键词:钢围堰 分层分块 施工 |