大跨度铁路V形刚构桥梁施工质量控制探讨(51卷) |
英文标题 |
Exploring on construction quality control over large-span railway V-shaped rigid framed bridge |
摘要 |
本文通过介绍新广州站站房鱼腹式三腹板槽型双线V形刚构组合连续箱梁原位现浇的施工工艺,简述了V形刚构组合连续箱梁现浇的施工质量控制关键要点,希望为今后类似工程的施工和质量管理提供一些参考借鉴。 |
作者 |
新闻作者:苏伟清 |