|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
标题 |
软弱富水地层隧道下穿燃气管道变形控制技术(51 卷) |
英文标题 |
Control over deformation of gas-pipeline during tunnel buried in soft and water-rich stratum passing through under it |
摘要 |
深圳地铁4号线Ⅱ期工程K9+105—K9+135段位于软弱富水地层中,并且隧道在该段下穿一条φ508 mm×7.9 mm(外径×厚度)次高压燃气管道(压力1.6 MPa)。在燃气管道保护的设计与施工中采用了多种处理措施,如采取地面帷幕分舱止水、洞外削土卸荷;洞内全断面注浆、大管棚导向跟 |
作者 |
新闻作者:谭信荣,陈寿根,王靖华 |
关键字 |