高速铁路高架站箱梁利用既有梁场预制架设技术(51 卷) |
英文标题 |
Prefabricated erection of elevated box girder using existing manufacturing field for high speed railway |
摘要 |
介绍了高速铁路高架站到发线上简支箱梁利用既有梁场进行预制架设施工的方案。以京沪高铁镇江高架站施工为例,为满足现有施工设备及节点工期要求,加快施工进度,减少和消除对后期工程的影响,对高架站到发线上箱梁采用既有设备改造后预制架设的方法。该经验可供同类工程参考 |